The Warrick County street surfacing program with Liquid Road Ultrablend surfacer will begin on or after MONDAY, AUGUST 29, 2022 through FRIDAY SEPTEMBER 16, 2022. Weather and pavement conditions permitting.
Warrick County Highway Department letter to residents.
Warrick County Liquid Road Surfacing Areas.
See below for the daily surfacing schedule.
Streets will NOT be closed off completely. Streets will be surfaced on only one side of the street each day. When surfacing is applied on one half of the street, the opposite side will be ONE WAY in the normal direction. Cul-de-sac streets will be TWO WAY in the lane not being surfaced. Streets will be coned off, and Flaggers will direct traffic where required.
Signs will be posted. We will provide traffic control. Please obey the flaggers if present. DO NOT park on the streets. Directional signs and NO PARKING signs will be posted. We will provide traffic control. Please obey the flaggers.
DO NOT park on the streets. Traffic must be able to use the side of the street we are not surfacing. Tow trucks will be on standby to remove vehicles parked on the street. Please contact any contractors or lawn service providers and notify them of these restrictions.
Surfacing is weather-dependent. Rain will alter the schedule. If your street is rained out, it will be scheduled for the next day. The entire schedule will be pushed back according to the weather.
LIQUID ROAD Ultrablend is an applied liquid (Application Video). It is a two-coat system. We will apply the first coat in the morning starting at 7 AM. If you must leave for the day, cars must be removed from driveways and garages by 7 AM and remain out until the street is re-opened. We will apply the second coat the following day. The same instructions will apply to the second coat.
THE SEALCOATED LANE MAY BE CLOSED OVERNIGHT TO ALLOW LIQUID ROAD TO DRY AND BEGIN CURING. PLEASE PLAN ACCORDINGLY.
DO NOT drive through wet surfacing. This is what happens. Driving through or walking on wet Sealer will track and splash on cars. When Liquid Road is dry, it will not track. If orange cones are in place, the surface is still wet – DO NOT drive or walk in the coned-off area.
DAILY SURFACING SCHEDULE
TUESDAY 8/30/22 to FRIDAY 9/2/22 – CRACKSEALING in both Subdivisions
TUESDAY 9/6/22 – RAINED OUT
WEDNESDAY 9/7/22
Landmark Subdivision – RED area 1st coat – Complete
Marquette – RED area 1st coat – Complete
THURSDAY 9/8/22
Landmark Subdivision – RED area 2nd coat – Complete
Marquette – RED area 2nd coat – Complete
FRIDAY 9/9/22
Landmark Subdivision – BLUE area 1st coat
Eau Claire Cul-de-sac – BLUE and WHITE
MONDAY 9/12/22
Landmark Subdivision – BLUE 2nd coat
TUESDAY 9/13/22
Eau Claire – PURPLE area 1st coat
Fond du Lac – Purple area 1st coat
WEDNESDAY 9/14/22
Eau Claire – PURPLE area 2nd coat
Fond du Lac – Purple area 2nd coat
Radisson – PURPLE area 2nd coat
Oshkosh – PURPLE area 2nd coat
Tippecanoe – PURPLE area 2nd coat
THURSDAY 9/15/22
Eau Claire – WHITE area 1st coat
Fond du Lac – WHITE area 1st coat
Radisson – WHITE area 1st coat
Tipecanoe – WHITE area 1st coat
FRIDAY 9/16/22
Eau Claire – WHITE area 2nd coat
Fond du Lac – WHITE area 2nd coat
Radisson – WHITE area 2nd coat
PLEASE CHECK THIS SITE OFTEN FOR SCHEDULE UPDATES