CARMEL CHERRY CREEK LIQUID ROAD SURFACING

sealcoat schedule CARMEL CHERRY CREEK LIQUID ROAD SURFACING

Cherry Creek Liquid Road Project 2023

As part of the City’s Pavement Preservation Program the streets in your neighborhood will receive a Liquid Road surfacing treatment.

Cherry Creek Liquid Road Street Locations

Carmel Street Department Letter to Residents

See below for the daily surfacing schedule. Click on the street name for the daily work area.

Streets will not be closed off completely. Streets will be surfaced each day on one side. Streets will be barricaded and coned off.

Directional signs and NO PARKING signs will be posted.
We will provide traffic control. Please obey flaggers if present.

DO NOT park on the streets. Tow trucks will be on standby to remove
vehicles parked on the street. Please contact any contractors or lawn
service providers and notify them of these restrictions.

Surfacing is weather-dependent. Rain will alter the schedule. If your
street is rained out, it will be scheduled for the next day. The entire
schedule will be pushed back according to the weather.

LIQUID ROAD Ultrablend is an applied liquid (Application Video). It is a two-coat system. We will apply the first coat in the morning starting at 7 AM.
We will apply the second coat the following day. We
expect to have  each coat applied by early afternoon. If we have
sun, breeze, and low humidity, we may have the street opened in the early evening; however, you should expect the street to be closed until 7
PM that evening.

We will then surface the opposite side of the street the following day. We will follow the same procedure as above. Please plan accordingly.

Intersections will remain open. Surfacing of intersections will be staged so intersections remain accessible.

DO NOT drive through wet surfacing. This is what happens. Driving through or walking on wet Sealer will track and splash on cars. When Liquid Road is dry, it will not track. If barricades and orange cones are in place, the surface is still wet – DO NOT drive or walk in the coned-off area.

DAILY SURFACING SCHEDULE

WEDNESDAY  7-05-23

CRACKSEAL STREETS

THURSDAY 7-06-23 RED

Klingensmith Blvd  – 1st Coat

Freemont Ln and Arcadian Cir – 1st Coat

Vestal Ct – 1st Coat

Canoe Ln – 1st Coat

FRIDAY 7-07-23  RED

Klingensmith Blvd – 2nd Coat

Freemont Ln and Arcadian Cir – 2nd Coat

Vestal Ct – 2nd Coat

Canoe Ln – 2nd Coat

MONDAY 7-10-23  BLUE

Klingensmith Blvd – 1st Coat

Freemont Ln and Arcadian Cir – 1st Coat

Vestal Ct – 1st Coat

Canoe Ln – 1st Coat

TUESDAY 7-11-23  BLUE

Klingensmith Blvd – 2nd Coat

Freemont Ln and Arcadian Cir –  2nd Coat

Vestal Ct – 2nd Coat

Canoe Ln – 2nd Coat