Columbus Liquid Road Surfacing

sealcoat schedule Columbus Liquid Road Surfacing

Columbus Pavement Preservation 2023

As part of the City’s Pavement Preservation Program the streets in your neighborhood will receive a Liquid Road surfacing treatment.

Columbus Pavement Preservation Surfacing Areas 2023

Columbus City Engineer Letter to Residents

Liquid Road Ultrablend asphalt surfacing will be applied to the following Columbus streets commencing Thursday, July 13 (weather permitting).

See below for the daily surfacing schedule. Click on the street name for the daily work area.

Streets will not be closed off completely. Streets will be surfaced each day on one side. Streets will be barricaded and coned off.

Directional signs and NO PARKING signs will be posted.
We will provide traffic control. Please obey flaggers if present.

DO NOT park on the streets. Tow trucks will be on standby to remove
vehicles parked on the street. Please contact any contractors or lawn
service providers and notify them of these restrictions.

Surfacing is weather-dependent. Rain will alter the schedule. If your
street is rained out, it will be scheduled for the next day. The entire
schedule will be pushed back according to the weather.

LIQUID ROAD Ultrablend is an applied liquid (Application Video). It is a two-coat system. We will apply the first coat in the morning starting at 7 AM.
We will apply the second coat the following day. We
expect to have  each coat applied by early afternoon. If we have
sun, breeze, and low humidity, we may have the street opened in the early evening; however, you should expect the street to be closed until 7
PM that evening.

We will then surface the opposite side of the street the following day. We will follow the same procedure as above. Please plan accordingly.

Intersections will remain open. Surfacing of intersections will be staged so intersections remain accessible.

DO NOT drive through wet surfacing. This is what happens. Driving through or walking on wet Sealer will track and splash on cars. When Liquid Road is dry, it will not track. If barricades and orange cones are in place, the surface is still wet – DO NOT drive or walk in the coned-off area.

Click on street name to link to daily surfacing areas.

FRIDAY 7-14-23   

Terrace Woods Dr    RED – 1st coat  complete

Pippin North     RED – 1st coat complete

Pippin South     RED – 1st coat complete

Macintosh     RED – 1st coat complete

Grimes Way     RED – 1st coat complete

Breaburn     RED – 1st coat complete

Jonathon Ridge     RED – 1st coat complete

Monday 7-17-23

Intersections in all subdivisions

Tuesday 7-18-23 

Terrace Woods Dr    RED – 2nd coat complete

Pippin North     RED – 2nd coat complete

Pippin South     RED – 2nd coat complete

Macintosh     RED – 2nd coat complete

Grimes Way     RED – 2nd coat complete

Breaburn     RED – 2nd coat complete

Jonathon Ridge     RED – 2nd coat complete

Wednesday 7-19-23  

Terrace Woods Dr    BLUE – 1st coat complete

Pippin North      BLUE – 1st coat complete

Pippin South      BLUE – 1st coat complete

Macintosh      BLUE – 1st coat complete

Grimes Way      BLUE – 1st coat complete

Breaburn      BLUE – 1st coat complete

Jonathon Ridge      BLUE – 1st coat complete

Thursday 7-20-23

Terrace Woods Dr    BLUE – 2nd coat – complete

Pippin North     BLUE – 2nd coat – complete

Grimes Way     BLUE – 2nd coat – complete

Monday 7-24-23

Pippin North     BLUE – 3rd coat – repair UPS tracks – complete

Pippin South     BLUE – 2nd coat – complete

Macintosh     BLUE – 2nd coat – complete

Breaburn     BLUE – 2nd coat – complete

Jonathon Ridge     BLUE – 2nd coat – complete

 

Pinehill Ct    RED – 1st Coat – complete

Brookfield Dr & Brookfield Ct    RED 1st coat – complete

Tuesday 7-25-23

Pinehill Ct    RED – 2nd coat – complete

Brookfield Dr & Brookfield Ct    RED 2nd coat – complete

 

Waterside      RED – 1st Coat – complete

Greystone Ct    RED – 1st Coat – complete

Boulder Ct    RED – 1st Coat – complete

Wednesday 7-26-23

Pinehill Ct    BLUE -1st coat – complete

Brookfield Dr & Brookfield Ct    BLUE 1st coat – complete

 

Waterside     RED – 2nd coat -complete

Greystone Ct    RED – 1st coat -complete

Boulder Ct    RED – 1st  coat – complete

Thursday 7-27-23

Pinehill    BLUE – 2nd coat – complete

Brookfield Dr & Brookfield Ct    BLUE 2nd coat -complete

 

Waterside    BLUE -1st coat – complete

Greystone Ct    RED 2nd coat – complete

Boulder Ct    RED 2nd coat coat – complete

Monday 7-31-23

Waterside    BLUE – 2nd coat

Greystone Ct    BLUE – 1st coat

Boulder Ct    BLUE – 1st coat

CR 150 W  RED  –  1st coat Full Street Closure

Stratton Ct  RED  –  1st Coat

Tuesday 8-1-23

Greystone Ct    BLUE – 2nd coat

Boulder Ct    BLUE – 2nd coat

CR 150 W    Full Street – 2nd  coat

Stratton Ct     RED – 2nd coat

Tuesday 8-1-23

CR150 W   Full Street – 2nd coat

Stratton Ct     RED – 2nd coat

Wednesday 8-2-23

Stratton Ct    Blue – 1st coat

Thursday 8-3-23

Stratton Ct    Blue – 2nd coat

Friday 8-4- 23

Intersections

 

 

 

 

 

 

 

 

 

Please check this website for updates.